S-CBAM
S-CBAM produces, from your own production data, the Monitoring Plan, Operator Emissions Report and Summary Emissions Report that a manufacturer exporting to the European Union (EU) under the Carbon Border Adjustment Mechanism (CBAM) has to produce in the definitive period.
The calculation rests on your installation's real data rather than on assumptions; wherever your emissions intensity comes in below the default value, that difference works directly in your favour. You define your installation boundary, your processes and your source streams once, and each period you enter only the period data. Several installations and several products are managed under one account. When your customer in the EU asks for data, the document is already there.
If One of These Describes You
From Your Own Data to the Output the Rules Ask for
We were part of the CBAM process at more than 50 companies during the transitional period.
In the definitive period a third-country operator sending goods to the EU has to produce three documents: a Monitoring Plan, an Operator Emissions Report and a Summary Emissions Report. S-CBAM produces all three from your installation and production data.
S-CBAM in 6 Steps
- 01Installation and Boundary DefinitionYou define the installation, the production route and the product groups to be reported. The system fixes the installation boundary and which processes enter the calculation.
- 02Process and Source Stream Set-upYou define the input and output streams of each process. From that structure the system builds the skeleton of the Monitoring Plan.
- 03Period Data EntryOutput volume, fuel and electricity consumption, waste gas and allocated heat flows, and precursor purchases are entered. You can key data in through the interface, upload it in bulk, or ask for a connection to the systems you already run. System connections are built project by project.
- 04Collecting Supplier DataYou request the data you need from your precursor suppliers through a separate flow and link the responses to the calculation. Where no data can be obtained for an item, the default value is used.
- 05Calculation and ChecksThe system calculates embedded emissions and compares the result against the default value.
- 06Document OutputThree documents are produced: the Monitoring Plan, the Operator Emissions Report and the Summary Emissions Report. The raw data and intermediate results behind the calculation stay in the system; regenerating a document from the same data gives the same result. Documents are produced ready for verification; verification itself is carried out by an independent verification body.
The Questions We Hear Most About S-CBAM
Can I not just use default values? Why collect real data?
Default values are set on the conservative side. Your own production data usually shows a different emissions intensity, and that difference works directly for or against you. S-CBAM puts the two values side by side and gives the difference as a percentage; it does not calculate a monetary amount, and the decision is yours.
I cannot get data from my precursor suppliers. What happens then?
Supplier data requests run as a separate flow in the system; who was asked for what, and what came back, is on record. For items where no data arrives, the default value is used.
Who uploads these documents to the EU system — me or the importer?
The party that reports into the EU system is the declarant in the EU. As the manufacturer, your responsibility is to produce correctly the data and documents that declaration will rest on. S-CBAM produces those documents and makes them ready for you to pass to your buyer; it does not submit anything to the EU system on your behalf.
Is the Excel template I used in the transitional period no longer valid?
The transitional template was designed for the obligation of that period; in the definitive period the expected document set, the level of data detail and the degree of traceability are different. S-CBAM produces the definitive-period documents. The data in your existing file is not lost and can be carried over into the system.
Do I have to key the data in, or can it connect to our systems?
You can key data in through the interface, upload it in bulk, or ask for a connection to the systems you already run. System connections are built project by project.
We have several installations and several products. Can they all be managed in one account?
Yes. Multi-site and multi-product structures are supported. Each installation is defined separately with its own boundary and processes, and reports are produced separately per installation and per product.
Contact
Write to us to talk through how your own production route would be modelled and which data items you will be asked for. If you are not sure whether you are in scope, you can look at the CBAM pre-assessment page first.